I have actually never been apart of a project long enough to beat the “final” stages for MEP. My question will pretty much berelated to this for final inspections.
1) Does a final inspection mean the toilets/sinks etc need to beinstalled?
If not is there a separate inspection required for that or it itjust apart of the MEP close out inspection?
submitted by /u/Takingmonday
[visit reddit] [comments]